Boiler Erection, Installation & Commissioning
Comprehensive erection and commissioning of utility, AFBC, CFBC, waste heat recovery, and package boilers up to 350 TPH under IBR standards.
Technical Scope & Methodology
S.R. Tech Engineering Services provides turnkey engineering, procurement, and construction (EPC) for heavy industrial boilers. As an IBR approved contractor, we handle everything from heavy pressure part alignment, drum lifting, membrane wall assembly, superheaters, economizers, air pre-heaters, to statutory hydro-testing up to 250 bar.
Our dedicated teams ensure total compliance with Indian Boiler Regulations (IBR 1950) and ASME standards, executing rigorous QA/QC protocols to guarantee high thermal efficiency and maximum operational uptime.
Standards, Codes & Quality Parameters
Proven Turnkey Execution In This Domain
Erection & Commissioning of 150 TPH AFBC Boiler
High-Pressure P91 & P22 Steam Pipeline Network
Annual Shutdown & Complete Re-tubing of 210 MW Utility Boiler
Request RFP for This Service
Direct communication with our project engineering team for Boiler Erection, Installation & Commissioning.