Erection & Commissioning of 150 TPH AFBC Boiler
Turnkey mechanical erection of 150 TPH AFBC high pressure boiler including pressure parts, ducting, ESP, and high-pressure steam piping at 110 bar.
Project Execution & Technical Scope
Successfully executed complete structural fabrication, drum lifting, pressure parts erection, and statutory IBR hydraulic test at 165 kg/cm². The project was delivered 15 days ahead of schedule with zero safety incidents.
Site Parameters & Credentials
Client Organization:
Major Captive Power & Sugar Complex
Project Location:
Muzaffarnagar, Uttar Pradesh
Industrial Sector:
Power & Cogeneration
Year Delivered:
2024